
A small tool
Do I need planning permission? Seven questions about your house
Answer a few questions about the house and the work you have in mind. The answer lists every consent that applies, from planning permission and prior approval to listed building consent, with the reason for each.
Everything happens on this page. Your answers are never sent anywhere or kept.
How the check reaches its answer
It asks things in roughly the order a planning officer would. Each answer narrows the rules that can apply.
- Listing comes first. A listed house needs listed building consent for any work that affects its character, whatever the planning answer. The check always flags it, because internal works can need it too.
- Is permitted development available at all? Flats and maisonettes have no Part 1 householder rights. A planning condition can remove them for a particular house.
- The class limits. Rear extensions use Class A (A.1(f) to (j) and A.2 for conservation areas), dormers use Class B, rooflights use Class C and garden buildings use Class E. The measurements you enter are compared against each limit and every failed limit is listed.
- Article 4. If a direction covers this class of work, a result that would otherwise be permitted development becomes a planning application.
- Proof. Where the result is permitted development or prior approval, the check recommends a lawful development certificate, the formal confirmation.
Key thresholds used
| Work | Outside designated areas | Conservation area |
|---|---|---|
| Single storey rear | 3 m deep (4 m detached); up to 6 m (8 m) with prior approval; 4 m high | 3 m (4 m); no prior approval route; no side or wrap-around |
| Two storey rear | 3 m deep; 7 m from rear boundary | Not permitted development |
| Eaves near boundary | No higher than 3 m where the extension comes within 2 m of a boundary | Same |
| Dormer / roof addition | 40 m³ terrace, 50 m³ other; not on a front slope facing a road | Not permitted development |
| Rooflight | Max 150 mm projection, not above ridge | Same (unless Article 4) |
| Garden building | 2.5 m within 2 m of boundary; 3 m or 4 m (dual pitch) elsewhere; none in a listed curtilage | Also none beside the house |
| Demolition | Part 11 prior approval determination for buildings over 50 m³ | Planning permission for buildings over 115 m³ and walls 1 m+ by a road (2 m+ elsewhere) |
What the check cannot do
- It cannot see your drawings. "Original rear wall", "principal elevation" and "similar appearance" involve judgment, and the council's view is what counts.
- It does not cover every class: porches (Class D), hard surfaces (F), chimneys and flues (G), solar panels (Part 14) or changes of use.
- It assumes the house was not created through a change of use permitted development right, which also removes householder rights.
- It does not deal with building regulations, party wall notices, covenants or tree preservation orders.
For the full rules and worked examples, read permitted development rear extensions and permitted development in a conservation area. The limits come from the government's technical guidance for householders.